01.09.2003

Wildon primary school

Construction of the new primary school in Wildon.

The old primary school in Wildon was split up among two sites for lack of space, with six classes in the town, next to the church, and six classes on the premises of the comprehensive school. The market town Wildon commissioned a location study concerned with the situation of a “new primary school” in November 2000, with the aim of examining not only possible new locations, but also the suitability of the old primary school regarding the rooms required. After informing the local population and holding discussions on several occasions, a decision was taken in favour of locating the school on part of the open site next to the polytechnic in the immediate vicinity of the old primary school. The exact room layout plan was defined in co-operation with Styria Province, the local authorities, the teaching staff, and the parents’ association.
In October 2002 the local authorities commissioned Nussmüller Architekten ZT GmbH in Graz to carry out planning and ÖWGes to handle the building project. The unique natural setting on the eastern slope of Wildon’s castle mountain with two lakes and the impressive stock of trees have a major influence on the design idea. A building firmly anchored in the ground offers a counterbalance to the polytechnic, with the classroom wing hovering on supports above the natural setting, that is untouched by the building. The solid part housing all of the utility rooms in addition to the gym is of double-layer exposed reinforced concrete, while the two-storey ‘floating” classroom wing is a timber structure. A distinction is made here between the high-transparency corridor area facing the valley (arrival side) and the classroom wing facing the woods with individual fenestration and natural wood panelling. Inside the building, the focus is on simple wayfinding (hall – utility wing – classroom wing), outside on complex integration of the natural surroundings on two levels. An existing natural stone wall is renovated and extended, bringing the landscape right into the entrance area.
Generally, great value was attached to scale. All visual links were scaled to children’s eye-level (corridor glazing down to the floor, floor-level windows in classrooms).

adress: Wildon - Austria
planning: Nussmüller Architekten


 

  • 01.06.2003

    sports- and recreation centre in bad aussee

    New sports facility with stand in Bad Aussee. [...]
  • 01.05.2003

    sports- and recreation centre in stattegg

    New sports facility with stand in Graz. [...]
  • 01.09.2002

    Residential stage on a slope

    New detached house on a slope. [...]
  • 01.09.2002

    house b, in stattegg

    New house in Graz-Stattegg. [...]
  • 01.06.2002

    Karl Morre primary and comprehensive school

    Construction of the new Karl Morre primary school in Graz. [...]
  • 01.01.2002

    Indoor riding arena in Flyinge, Sweden

    New building – 50 x 100m free-span hall. [...]
  • 01.09.2001

    residential complex kindberg I+II

    Wohnanlage Kindberg Realisierung in mehreren Bauabschnitten. [...]
  • 01.04.2001

    Building Technology Centre – Graz University of Technology (TUG)

    Construction of a laboratory for Graz University of Technology. [...]
  • 01.08.2012

    house d, neuhofen

    Newbuilding of a single-familiy house in Neuhofen - Austria. wood-construction. [...]
  • 21.05.2012

    campus zapresic

    New University Campus in Zapresic, Masterplan [...]
  • 02.02.2012

    primary school seiersberg - graz

    addition of the primary school Seiersberg in Graz. [...]
  • 01.05.2011

    Gradnerstraße residential development

    Construction of a residential development in Graz. [...]
  • 01.01.2011

    Incoming Center Murtal

    concepts for a new hotel in Zeltweg. [...]
  • 01.07.2010

    sport centre kaštela, in croatia

    concept for a sports hall in Kaštela. [...]
  • 01.10.2009

    thermal renovation of residential complex Dieselweg

    renovation of the complex with the aim of an self-sufficient solar heat supply. [...]
  • 01.10.2009

    house m, in bad aussee

    newbuilding of a single family house in Bad Aussee. [...]
  • 01.09.2009

    Wood systems for nursery schools, Croatia

    Competition: development of wood systems for nursery schools in Croatia. [...]
  • 01.06.2009

    zagreb german-french school

    Two new international schools to be built in Zagreb. [...]
  • 01.05.2009

    stadium in dubrovnik

    Concept for the new stadium in Dubrovnik. [...]
  • 01.02.2009

    Josefinum child care centre, Leoben

    Innovative timber construction: nursery school, crèche, after-school care centre. [...]
  • 01.01.2008

    Mayr Melnhof office building, Leoben

    in the category public buildings, commercial buildings. [...]
  • 01.06.2007

    impulse centre zeltweg

    newbuilding of an office complex with exhibitionrooms. [...]
  • 01.01.2005

    STIA office building

    Construction of new office building for STIA Holzindustrie in Admont. [...]
  • 01.09.2004

    gak trainings centre in graz

    New training centre for Graz football club. [...]
  • 01.09.2003

    Wildon primary school

    Construction of the new primary school in Wildon. [...]